Apr
06
2019
WIP Update – 05-06 Apr 19
Besides making some more progress on Chapter 3 of JJ2, I also had to get the introduction whipped up for the post on Friday and a sizable chunk of my time has went into getting the plotline sorted out and related work in the peripheral materials. One of the big projects was getting a parallel calendar running so I can track dates between Earth time (the Imperial standard) and Miravel time. If I’m lucky, I might have the table of contents labeled before the weekend’s out. More to come. Stay tuned.