WIP Update – 05-06 Apr 19
Besides making some more progress on Chapter 3 of JJ2, I also had to get the introduction whipped up for the post on Friday and a sizable chunk of my time has went into getting the plotline sorted out and related work in the peripheral materials. One of the big projects was getting a parallel calendar running so I can track dates between Earth time (the Imperial standard) and Miravel time. If I’m lucky, I might have the table of contents labeled before the weekend’s out. More to come. Stay tuned.
No Comments
No comments yet.
Deprecated: Function comments_rss_link is deprecated since version 2.5.0! Use post_comments_feed_link() instead. in /home1/jcarmack/public_html/blog/wp-includes/functions.php on line 6114
RSS feed for comments on this post.
TrackBack URI